STEP 1Placement of aluminum profile on the construction
STEP 2Assembly of the fabric by being laid on the net
STEP 3Final form of the etfe system before being inflated with air pressure
STEP 4Assembly of the machinery and installation
STEP 5Making the final checks before inflation
STEP 6Starting inflation
STEP 7Completing the inflation
STEP 8Balancing the air pressure
STEP 9Air leakage control on the ready system, and delivery.