Photo Gallery
- 
  Step 1 : Placement of aluminum profile on the construction
- 
  Step 2 : Assembly of the fabric by being laid on the net
- 
  Step 3 : Final form of the etfe system before being inflated with air pressure
- 
  Step 4 : Assembly of the machinery and installation
- 
   Step 5 : Making the final checks before inflation
- 
  Step 6 : Starting inflation
- 
  Step 7 : Completing the inflation
- 
  Step 8 : Balancing the air pressure
- 
  Step 9 : Air leakage control on the ready system, and delivery.
 
 
 
 
